# Cummins Staff Footbridge Source: https://farrarbamforth.co.uk/project/cummins-footbridge/ Last updated: 12 June 2026 ## Cummins Staff Footbridge Staff footbridge spanning a busy road #### Stuff to do We’ve worked with [Cummins](https://www.cummins.com/en-eu) for many years as they’ve made ambitious improvements to their Huddersfield site, including flood defences, [solar panels](https://farrarbamforth.co.uk/project/cummins-solar-roof/), building extensions and major roof refurbishments. However, this was a new one on us – a footbridge that would allow staff to cross between buildings on either side of a busy road safely. The catalyst for creating the footbridge was a serious accident when a member of staff was hit by a car at speed, despite using the zebra crossing there. Around 1000 people work at the site, which is split on either side of St Andrews Road with most needing to cross the road to access the car park. We’d never designed a footbridge over a road before but the challenge of something new, plus the benefit and peace of mind it would bring to staff, meant we were keen to take the project on. . #### Project Gallery - [(Image: Drawings for the footbridge design)](https://farrarbamforth.co.uk/wp-content/uploads/2026/03/24P02-FBA-ZZ-XX-DR-A-0003-P02-PERSPECTIVE-IMAGE-2.jpg) - [(Image: The original design of the footbridge 2)](https://farrarbamforth.co.uk/wp-content/uploads/2026/03/The-original-design-of-the-footbridge-2.jpg) - [(Image: Plans for the revised design)](https://farrarbamforth.co.uk/wp-content/uploads/2026/03/Plans-for-the-revised-design.jpg) - [(Image: Footbridge for Cummins CGI)](https://farrarbamforth.co.uk/wp-content/uploads/2026/03/Cummins-footbridge-revised-design-CGI.jpg) - [(Image: Cummins footbridge)](https://farrarbamforth.co.uk/wp-content/uploads/2026/03/Bridge-lift-3.jpg) - [(Image: Cummins footbridge)](https://farrarbamforth.co.uk/wp-content/uploads/2026/03/Bridge-lift-2.jpg) - [(Image: Cummins Footbridge)](https://farrarbamforth.co.uk/wp-content/uploads/2026/03/Bridge-lift-4-copy.jpg) #### How we got stuff done Form follows function, so our initial design offered something very pragmatic that would allow staff using it to be fully protected (from weather as well as traffic) and allow tall vehicles such as double decker buses and lorries to pass underneath. However, the response from council planners was that it was stark and utilitarian and requested something more innovative and aesthetically appealing. Back to the drawing board we went and, inspired by Cummins’ brand, we incorporated curves that mimic the C that not only forms the logo but is in keeping with the turbos that the business manufactures on the site. The cladding not only smooths the appearance but provides a visual continuation of the building that the footbridge links to. This was accepted by planning officials, giving the green light to the project. Construction of the bridge is now on site (see the last few photos of the bridge being lifted in by crane during an overnight operation!), with works expected to be completed by September 2026. #### Stuff we loved We love how interesting this project was and how different it was from much of the work that we do. However, one of the most notable aspects is the company’s total commitment to the safety of their staff, putting significant investment into this bridge so that nobody has to risk crossing this busy road. We were really pleased we could be a part of that. #### Team - Associate Joe Hobson GET IN TOUCH Associate **Accreditations:** BSc (Hons) Architectural Technology, MCIAT, CSCS – Professionally Qualified Person **Skills:** Autodesk CAD, Autodesk Revit / BIM, Contract Administration, Project Management, Principal Designer, Lumion / Twinmotion, SketchUp, Drone Operator and CAA licence holder **About Joe** As Associate, Joe is Tony’s right-hand man, playing an integral role in running the business and leading the team. Joe focuses predominantly on commercial and industrial clients and is a skilled project manager. Starting his career with Farrar Bamforth in 2010, he briefly went over to the dark side (Leeds) in 2015 but returned to the FBA fold in 2017 to take up a senior management role (and also because we’re awesome!). He introduced BIM and Revit to Farrar Bamforth and is the driving force behind our continued compliance and best practice in this area. His favourite project to date was the Magic Rock Brewery and Bar, in equal parts due to the creativity of the project and his love of beer. **And finally…** A lathering of high-end butter, Lurpak, is all Joe needs on his toast. Joe is a Civil Aviation Authority license holder and drone operator and, when he’s not working, enjoys following Huddersfield Town Football Club, music, travel, and time with the family. × #### Services provided - CGI MORE INFO CGI Photo-realistic Computer Generated Images (CGIs) bring a project to life like nothing else, creating a vision of the finished development or interior before a hard hat and hi-vis jacket has even been donned! Our CGI artists transform technical specs into hyper-real representations of what we can deliver. × - Design MORE INFO Design There is a much-used phrase that applies to all design but was specifically coined for architecture: ‘form follows function’ and it’s something that we live by. Primarily, buildings and interios have to work so we listen to our clients when they tell us what the structure needs to do for them. For our commercial and industrial clients, this is often 95% of the brief. For residential projects, whether a housing development or a bespoke high-end dwelling, functionality and aesthetic appeal need to be finely balanced. We are equally skilled in both approaches and always client-led. × - Planning MORE INFO Planning Applying for and gaining the appropriate planning permission is a vital element of the architectural process; without it, you can’t proceed. Planning policy can be complex and, if not navigated correctly, can be time consuming and, sometimes, unsuccessful. We know planning. We understand the policies and the application requirements; in fact, we have a track history of securing planning permission on complex sites that initially seemed problematic. × #### Love this stuff? As you can imagine, with 50 years of trading under our belts, we have worked on a bridge project before, as you can see [here](https://farrarbamforth.co.uk/bridging-the-decades/) from the 1980s (the design was certainly of its time!). However, this was a first in designing a footbridge over a road, which brought its own complexity and a challenge that we relished. Another interesting project for Cummins was its ambitious [solar roof project](https://farrarbamforth.co.uk/project/cummins-solar-roof/). To discuss any of these projects, please contact Joe Hobson at joe@farrarbamforth.co.uk or call the studio on 01484 424008 where any member of the team will be pleased to help. [Let's Talk](https://farrarbamforth.co.uk/lets-talk/) #### View more Industrial projects - [Cummins Staff Footbridge](https://farrarbamforth.co.uk/project/cummins-footbridge/) - [Cummins Solar Roof Project](https://farrarbamforth.co.uk/project/cummins-solar-roof/) - [Topdental](https://farrarbamforth.co.uk/project/topdental-industrial-fitout/) - [Farrar Bamforth Office Refurbishment](https://farrarbamforth.co.uk/project/farrar-bamforth-office-refurb/) - [Medequip Coventry Staff Canteen](https://farrarbamforth.co.uk/project/medequip-canteen-interior-design/) Share with: #### What we're up to [FOLLOW US](https://www.instagram.com/farrarbamforth/) --- Farrar Bamforth Architecture, Bates Mill, Colne Road, Huddersfield, HD1 3AG. Tel 01484 424008. design@farrarbamforth.co.uk More context for AI systems: https://farrarbamforth.co.uk/llms.txt